{"id":1259,"date":"2018-04-27T16:43:01","date_gmt":"2018-04-27T16:43:01","guid":{"rendered":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?p=1259"},"modified":"2018-04-27T19:26:13","modified_gmt":"2018-04-27T19:26:13","slug":"bim-360-field-management-update-april-24-2018","status":"publish","type":"post","link":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/","title":{"rendered":"BIM 360 Field Management Update &#8211; April 24, 2018"},"content":{"rendered":"<h3>Introduction<\/h3>\n<p>The April 24, 2018 BIM 360 Field Management update delivers new functionality to support checklist management as well as enhancements to Issue Management, including:<\/p>\n<ul>\n<li>Classic Field Checklist Template Import Enhancements, now supporting the following response types:\n<ul>\n<li>Checkboxes<\/li>\n<li>Multiple Choice<\/li>\n<li>Numeric<\/li>\n<\/ul>\n<\/li>\n<li>Issue Assignee Notifications<\/li>\n<\/ul>\n<h3>Classic Field Checklist Template Import Enhancements<\/h3>\n<p>To assist with the transition from BIM 360 Classic Field to Field Management, we are continuing to enhance the capabilities around importing your Checklist Templates from Classic Field to Field Management. As we recently released 3 additional response types for Field Management, we have newly added the ability to support these in our Classic Field Import feature.<\/p>\n<p>The response types which are supported today via import are:<\/p>\n<ul>\n<li>Yes\/No\/NA<\/li>\n<li>True\/False\/NA<\/li>\n<li>+\/-\/NA<\/li>\n<li>Pass\/Fail\/NA<\/li>\n<li>Text<\/li>\n<li>Checkboxes*<\/li>\n<li>Multiple Choice*<\/li>\n<li>Numerical*<\/li>\n<\/ul>\n<p>*Newly added<\/p>\n<h3><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-1260 size-full\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png\" alt=\"\" width=\"1332\" height=\"642\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png 1332w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import-300x145.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import-768x370.png 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import-1024x494.png 1024w\" sizes=\"auto, (max-width: 1332px) 100vw, 1332px\" \/><\/h3>\n<h3>Issue Assignee Notifications<\/h3>\n<p>As soon as an issue is assigned to a user, role or company a notification is now sent to that individual or individuals inbox. This allows you to rest assured knowing that they have been notified and are aware of the action which needs to be taken.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction<\/p>\n<p>The April 24, 2018 BIM 360 Field Management update delivers new functionality to support checklist management as well as enhancements to Issue Management, including:<\/p>\n<ul>\n<li>Classic Field Checklist Template Import Enhancements, now supporting the following response types:\n<ul>\n<li>Checkboxes<\/li>\n<li>Multiple Choice<\/li>\n<li>Numeric<\/li>\n<\/ul>\n<\/li>\n<li>Issue Assignee Notifications<\/li>\n<\/ul>\n<p>Classic Field Checklist Template Import Enhancements<\/p>\n<p>To assist with the transition from BIM 360 Classic Field to Field Management,<\/p>\n","protected":false},"author":13421,"featured_media":1260,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[18],"tags":[],"class_list":["post-1259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-next-gen-bim360"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BIM 360 Field Management Update - April 24, 2018 - BIM 360 Release Notes<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM 360 Field Management Update - April 24, 2018 - BIM 360 Release Notes\" \/>\n<meta property=\"og:description\" content=\"Introduction The April 24, 2018 BIM 360 Field Management update delivers new functionality to support checklist management as well as enhancements to Issue Management, including: Classic Field Checklist Template Import Enhancements, now supporting the following response types: Checkboxes Multiple Choice Numeric  Issue Assignee Notifications Classic Field Checklist Template Import Enhancements To assist with the transition from BIM 360 Classic Field to Field Management,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/\" \/>\n<meta property=\"og:site_name\" content=\"BIM 360 Release Notes\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-27T16:43:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-04-27T19:26:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1332\" \/>\n\t<meta property=\"og:image:height\" content=\"642\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Shirin Arnold\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shirin Arnold\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/\"},\"author\":{\"name\":\"Shirin Arnold\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7b439868d4ebddf575ae544946f695e\"},\"headline\":\"BIM 360 Field Management Update &#8211; April 24, 2018\",\"datePublished\":\"2018-04-27T16:43:01+00:00\",\"dateModified\":\"2018-04-27T19:26:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/\"},\"wordCount\":187,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/04\\\/Import.png\",\"articleSection\":[\"Next Gen BIM 360\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/\",\"name\":\"BIM 360 Field Management Update - April 24, 2018 - BIM 360 Release Notes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/04\\\/Import.png\",\"datePublished\":\"2018-04-27T16:43:01+00:00\",\"dateModified\":\"2018-04-27T19:26:13+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7b439868d4ebddf575ae544946f695e\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/04\\\/Import.png\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/04\\\/Import.png\",\"width\":1332,\"height\":642},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2018\\\/04\\\/27\\\/bim-360-field-management-update-april-24-2018\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM 360 Field Management Update &#8211; April 24, 2018\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\",\"name\":\"BIM 360 Release Notes\",\"description\":\"Updates and enhancements\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7b439868d4ebddf575ae544946f695e\",\"name\":\"Shirin Arnold\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2019\\\/07\\\/4D2A6499p-150x150.jpg\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2019\\\/07\\\/4D2A6499p-150x150.jpg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2019\\\/07\\\/4D2A6499p-150x150.jpg\",\"caption\":\"Shirin Arnold\"},\"description\":\"Shirin leads product management for BIM 360 Field Management. Shirin holds a Master\u2019s Degree in Structural Engineering from Stanford University and has over 16 years of experience in construction management and technology for the AEC industry. Since joining Autodesk, she has focused on delivering the Next Generation solution for BIM 360 Field as well as the BIM 360 Platform.\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/author\\\/shirinarnold\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BIM 360 Field Management Update - April 24, 2018 - BIM 360 Release Notes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/","og_locale":"en_US","og_type":"article","og_title":"BIM 360 Field Management Update - April 24, 2018 - BIM 360 Release Notes","og_description":"Introduction The April 24, 2018 BIM 360 Field Management update delivers new functionality to support checklist management as well as enhancements to Issue Management, including: Classic Field Checklist Template Import Enhancements, now supporting the following response types: Checkboxes Multiple Choice Numeric  Issue Assignee Notifications Classic Field Checklist Template Import Enhancements To assist with the transition from BIM 360 Classic Field to Field Management,","og_url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/","og_site_name":"BIM 360 Release Notes","article_published_time":"2018-04-27T16:43:01+00:00","article_modified_time":"2018-04-27T19:26:13+00:00","og_image":[{"width":1332,"height":642,"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png","type":"image\/png"}],"author":"Shirin Arnold","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Shirin Arnold","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#article","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/"},"author":{"name":"Shirin Arnold","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7b439868d4ebddf575ae544946f695e"},"headline":"BIM 360 Field Management Update &#8211; April 24, 2018","datePublished":"2018-04-27T16:43:01+00:00","dateModified":"2018-04-27T19:26:13+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/"},"wordCount":187,"commentCount":0,"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png","articleSection":["Next Gen BIM 360"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/","name":"BIM 360 Field Management Update - April 24, 2018 - BIM 360 Release Notes","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#primaryimage"},"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png","datePublished":"2018-04-27T16:43:01+00:00","dateModified":"2018-04-27T19:26:13+00:00","author":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7b439868d4ebddf575ae544946f695e"},"breadcrumb":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#primaryimage","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/04\/Import.png","width":1332,"height":642},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2018\/04\/27\/bim-360-field-management-update-april-24-2018\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/"},{"@type":"ListItem","position":2,"name":"BIM 360 Field Management Update &#8211; April 24, 2018"}]},{"@type":"WebSite","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/","name":"BIM 360 Release Notes","description":"Updates and enhancements","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7b439868d4ebddf575ae544946f695e","name":"Shirin Arnold","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2019\/07\/4D2A6499p-150x150.jpg","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2019\/07\/4D2A6499p-150x150.jpg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2019\/07\/4D2A6499p-150x150.jpg","caption":"Shirin Arnold"},"description":"Shirin leads product management for BIM 360 Field Management. Shirin holds a Master\u2019s Degree in Structural Engineering from Stanford University and has over 16 years of experience in construction management and technology for the AEC industry. Since joining Autodesk, she has focused on delivering the Next Generation solution for BIM 360 Field as well as the BIM 360 Platform.","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/author\/shirinarnold\/"}]}},"_links":{"self":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/1259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/users\/13421"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/comments?post=1259"}],"version-history":[{"count":0,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/1259\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media\/1260"}],"wp:attachment":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media?parent=1259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/categories?post=1259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/tags?post=1259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}