{"id":2000,"date":"2020-03-24T12:25:08","date_gmt":"2020-03-24T12:25:08","guid":{"rendered":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?p=2000"},"modified":"2020-04-22T14:03:39","modified_gmt":"2020-04-22T14:03:39","slug":"bim-360-cost-management-updates-march-2020","status":"publish","type":"post","link":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/","title":{"rendered":"BIM 360 Cost Management Updates &#8211; March 2020"},"content":{"rendered":"<h1><b>Cost Management + Autodesk Construction Cloud Connect\u00a0<\/b><\/h1>\n<p><span style=\"font-weight: 400\">Autodesk Construction Cloud Connect is an out-of-box, no-code platform that allows you to create integrations without relying on engineering resources. With Cost Management&#8217;s APIs and Autodesk Construction Cloud Connect, building integrations to other applications becomes\u00a0 a breeze; for example, when a purchase order is created or approved in BIM 360 Cost Management, you can automatically generate a purchase order or invoice in your accounting system such as Quickbooks Online.<\/span><\/p>\n<h1><b>Additional Cost Management Enhancements<\/b><\/h1>\n<h3>1. Create custom Main\/Prime Contract SOV headings and ability to hide child items<\/h3>\n<p>Additional flexibility for generating Main Contract SOVs. Users can create sub headings in the Main Contract set up and choose to allocate budget items to particular headings.<\/p>\n<p>Child items which may not be required to be shown to the Owner can be hidden in the edit mode so they only see parent summaries in the Pay Application<\/p>\n<h3><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2022\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_14-17-54.png\" alt=\"\" width=\"1288\" height=\"1276\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_14-17-54.png 1288w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_14-17-54-300x297.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_14-17-54-1024x1014.png 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_14-17-54-150x150.png 150w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_14-17-54-768x761.png 768w\" sizes=\"auto, (max-width: 1288px) 100vw, 1288px\" \/><\/h3>\n<p>The sub items can be temporarily shown and hidden using the context menu in the overview mode<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2023\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/showhide-subitems.gif\" alt=\"\" width=\"2860\" height=\"1314\" \/><\/p>\n<h3><\/h3>\n<h3>2. Showing OCOs in Main Contract as columns &#8211; excel export<\/h3>\n<p>Approved Owner Changes can either be shown collated as line items at the bottom of the SOV or inline and summarised in a column. If you have selected to show in a column and select export every OCO is shown in its own column to help clarify change history<\/p>\n<h3><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2034\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/co-column-2.jpg\" alt=\"\" width=\"424\" height=\"134\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/co-column-2.jpg 424w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/co-column-2-300x95.jpg 300w\" sizes=\"auto, (max-width: 424px) 100vw, 424px\" \/><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2035\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/CO-column.jpg\" alt=\"\" width=\"2194\" height=\"803\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/CO-column.jpg 2194w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/CO-column-300x110.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/CO-column-1024x375.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/CO-column-768x281.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/CO-column-1536x562.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/CO-column-2048x750.jpg 2048w\" sizes=\"auto, (max-width: 2194px) 100vw, 2194px\" \/><\/p>\n<h3>3. Include Budget Transfers when generating Main\/Prime Contract SOV<\/h3>\n<p>When the Main Contract is generated from the Budget any changes to the scheduled value made by using &#8216;Budget Transfer&#8217; will be used in the calculation<\/p>\n<h3><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2030\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-1-45.png\" alt=\"\" width=\"1766\" height=\"320\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-1-45.png 1766w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-1-45-300x54.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-1-45-1024x186.png 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-1-45-768x139.png 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-1-45-1536x278.png 1536w\" sizes=\"auto, (max-width: 1766px) 100vw, 1766px\" \/><\/h3>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2029\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-0-26.png\" alt=\"\" width=\"1632\" height=\"390\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-0-26.png 1632w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-0-26-300x72.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-0-26-1024x245.png 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-0-26-768x184.png 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_17-0-26-1536x367.png 1536w\" sizes=\"auto, (max-width: 1632px) 100vw, 1632px\" \/><\/p>\n<h3><\/h3>\n<h3>4. Lock supplier contract SOV during batch selection<\/h3>\n<p><span data-preserver-spaces=\"true\">When selecting which supplier pay applications are required for a billing period, if there are contracts not yet locked which is a requirement, they can now can be locked and selected in the same user interface so you don&#8217;t have to leave the view<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2002\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/batch-create-cost-payment.gif\" alt=\"\" width=\"2860\" height=\"1336\" \/><\/p>\n<h3><\/h3>\n<h3><\/h3>\n<h3>5. Budget Pay App &#8211; view Owner Change Orders as child line items or in separate column<\/h3>\n<p>Added flexibility to view OCOs in the Budget Pay application summarised in a column or expanded as child items of each SOV line.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2007\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/budget-payment-show-OCO-as-column.gif\" alt=\"\" width=\"2852\" height=\"1336\" \/><\/p>\n<h3><\/h3>\n<h3>6. Activity Milestone<\/h3>\n<p>As well as the overall history in Project Admin activity history is now available filtered by sub-module in the flyout<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2036\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/activity.jpg\" alt=\"\" width=\"1741\" height=\"779\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/activity.jpg 1741w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/activity-300x134.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/activity-1024x458.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/activity-768x344.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/activity-1536x687.jpg 1536w\" sizes=\"auto, (max-width: 1741px) 100vw, 1741px\" \/><\/p>\n<h3>7. Customisable Change Order Type Codes<\/h3>\n<p>Some users require the ability to segregate different types of Change Order by using different code structures. EG An &#8216;Owner Change Order&#8217; and an &#8216;Authorisation Request&#8217; to allocate contingency might both be handled using &#8216;OCO&#8217; but want to track them separately. Now users can create and utilise different code structures based on &#8216;Type&#8217; for all parts of the Change Process<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2032\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/OCO-type-customize.gif\" alt=\"\" width=\"2032\" height=\"632\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2028\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_16-45-21.png\" alt=\"\" width=\"592\" height=\"618\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_16-45-21.png 592w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-17_16-45-21-287x300.png 287w\" sizes=\"auto, (max-width: 592px) 100vw, 592px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2031\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/OCO-type-as-prefix.gif\" alt=\"\" width=\"2032\" height=\"812\" \/><\/p>\n<h3>8. Additional customisable tabs<\/h3>\n<p>With the revised layout when Main Contract and Pay Apps were launched the naming of &#8220;Main Contract, Budget\/Cost Payment Application &amp; Change Order&#8221; is now also customisable<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2012\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-56-2.png\" alt=\"\" width=\"2186\" height=\"646\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-56-2.png 2186w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-56-2-300x89.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-56-2-1024x303.png 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-56-2-768x227.png 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-56-2-1536x454.png 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-56-2-2048x605.png 2048w\" sizes=\"auto, (max-width: 2186px) 100vw, 2186px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2016\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-9.png\" alt=\"\" width=\"1160\" height=\"158\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-9.png 1160w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-9-300x41.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-9-1024x139.png 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-9-768x105.png 768w\" sizes=\"auto, (max-width: 1160px) 100vw, 1160px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2017\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-51.png\" alt=\"\" width=\"1142\" height=\"160\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-51.png 1142w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-51-300x42.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-51-1024x143.png 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-3-9_13-59-51-768x108.png 768w\" sizes=\"auto, (max-width: 1142px) 100vw, 1142px\" \/><\/p>\n<h3><\/h3>\n<h3>9. Selectable numbers clearly identified<\/h3>\n<p><span data-preserver-spaces=\"true\">When reviewing Budget or Contract change history we have added a small indicator so it&#8217;s clearer which items can be selected to view build ups<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2003\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/clickable-number-improvements.gif\" alt=\"\" width=\"2856\" height=\"1336\" \/><\/p>\n<h3>10. Disallow budget line deletion<\/h3>\n<p>To prevent accidental data loss we have prevented budget line item deletion in the following scenarios<\/p>\n<ul>\n<li>There is budget transfer history<\/li>\n<li>It&#8217;s linked to a cost item or change order.<\/li>\n<li>It&#8217;s linked to the main contract.<\/li>\n<li>It&#8217;s linked to a supplier contract.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2009\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-2-19_21-18-5.png\" alt=\"\" width=\"1474\" height=\"692\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-2-19_21-18-5.png 1474w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-2-19_21-18-5-300x141.png 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-2-19_21-18-5-1024x481.png 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/image2020-2-19_21-18-5-768x361.png 768w\" sizes=\"auto, (max-width: 1474px) 100vw, 1474px\" \/><\/p>\n<h3>11. Append new budgets<\/h3>\n<p>Previously importing a new budget would completely override the existing one. Now, assuming there are no duplicates the 2nd import will append the existing. If the intention is to override then please delete the existing first<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2024\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/append-budgets.gif\" alt=\"\" width=\"2860\" height=\"1346\" \/><\/p>\n<p>&nbsp;<\/p>\n<h3>12. Disallow generating an xCO if the required value is empty.<\/h3>\n<p>When progressing a change to the next level eg PCO to RCO it&#8217;s expected a value will be entered in to the &#8216;Submitted&#8217; value in the cost item to populate the request amount to be submitted to the Owner.\u00a0 This could be easy to forget to do before generating and meant additional steps.<\/p>\n<p>We have now prevented generating unless the field is populated to help expedite the workflow and provide an indicator what the issue is<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2011\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/value-required-for-generating-xCO.gif\" alt=\"\" width=\"2856\" height=\"1336\" \/><\/p>\n<h3>13. Sync Cost Summary with current view<\/h3>\n<p>When moving through xCO views the cost summary tab will auto select to reflect the current opened view, eg RFQ = Proposed, RCO = Submitted, OCO = Approved, SCO = Committed<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2008\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/default-cost-summary-stage.gif\" alt=\"\" width=\"2856\" height=\"1336\" \/><\/p>\n<h3>14. Remember prior setting for Owner fields<\/h3>\n<p>Remember who was selected as recipient for Main Contract\/RCO\/OCO for the first one and show it automatically for all subsequent<\/p>\n<p>&nbsp;<\/p>\n<h3>15. Resize flyouts<\/h3>\n<p>The information flyout can now be extended for those occasions when you just sometimes need a little bit more..<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2033\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/resize-flyout.gif\" alt=\"\" width=\"2860\" height=\"1410\" \/><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cost Management + Autodesk Construction Cloud Connect\u00a0<\/p>\n<p>Autodesk Construction Cloud Connect is an out-of-box, no-code platform that allows you to create integrations without relying on engineering resources. With Cost Management&#8217;s APIs and Autodesk Construction Cloud Connect, building integrations to other applications becomes\u00a0 a breeze; for example, when a purchase order is created or approved in BIM 360 Cost Management,<\/p>\n","protected":false},"author":22366,"featured_media":2060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[81,18],"tags":[104],"class_list":["post-2000","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cost-management","category-next-gen-bim360","tag-cost-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BIM 360 Cost Management Updates - March 2020 - BIM 360 Release Notes<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM 360 Cost Management Updates - March 2020 - BIM 360 Release Notes\" \/>\n<meta property=\"og:description\" content=\"Cost Management + Autodesk Construction Cloud Connect\u00a0 Autodesk Construction Cloud Connect is an out-of-box, no-code platform that allows you to create integrations without relying on engineering resources. With Cost Management&#8217;s APIs and Autodesk Construction Cloud Connect, building integrations to other applications becomes\u00a0 a breeze; for example, when a purchase order is created or approved in BIM 360 Cost Management,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/\" \/>\n<meta property=\"og:site_name\" content=\"BIM 360 Release Notes\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-24T12:25:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-04-22T14:03:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1741\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ian Turner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Turner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/\"},\"author\":{\"name\":\"Ian Turner\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\"},\"headline\":\"BIM 360 Cost Management Updates &#8211; March 2020\",\"datePublished\":\"2020-03-24T12:25:08+00:00\",\"dateModified\":\"2020-04-22T14:03:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/\"},\"wordCount\":767,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2020\\\/03\\\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg\",\"keywords\":[\"cost management\"],\"articleSection\":[\"Cost Management\",\"Next Gen BIM 360\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/\",\"name\":\"BIM 360 Cost Management Updates - March 2020 - BIM 360 Release Notes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2020\\\/03\\\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg\",\"datePublished\":\"2020-03-24T12:25:08+00:00\",\"dateModified\":\"2020-04-22T14:03:39+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2020\\\/03\\\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2020\\\/03\\\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg\",\"width\":2560,\"height\":1741},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2020\\\/03\\\/24\\\/bim-360-cost-management-updates-march-2020\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM 360 Cost Management Updates &#8211; March 2020\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\",\"name\":\"BIM 360 Release Notes\",\"description\":\"Updates and enhancements\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\",\"name\":\"Ian Turner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"caption\":\"Ian Turner\"},\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/author\\\/ianturner\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BIM 360 Cost Management Updates - March 2020 - BIM 360 Release Notes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/","og_locale":"en_US","og_type":"article","og_title":"BIM 360 Cost Management Updates - March 2020 - BIM 360 Release Notes","og_description":"Cost Management + Autodesk Construction Cloud Connect\u00a0 Autodesk Construction Cloud Connect is an out-of-box, no-code platform that allows you to create integrations without relying on engineering resources. With Cost Management&#8217;s APIs and Autodesk Construction Cloud Connect, building integrations to other applications becomes\u00a0 a breeze; for example, when a purchase order is created or approved in BIM 360 Cost Management,","og_url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/","og_site_name":"BIM 360 Release Notes","article_published_time":"2020-03-24T12:25:08+00:00","article_modified_time":"2020-04-22T14:03:39+00:00","og_image":[{"width":2560,"height":1741,"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg","type":"image\/jpeg"}],"author":"Ian Turner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ian Turner","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#article","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/"},"author":{"name":"Ian Turner","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca"},"headline":"BIM 360 Cost Management Updates &#8211; March 2020","datePublished":"2020-03-24T12:25:08+00:00","dateModified":"2020-04-22T14:03:39+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/"},"wordCount":767,"commentCount":0,"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg","keywords":["cost management"],"articleSection":["Cost Management","Next Gen BIM 360"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/","name":"BIM 360 Cost Management Updates - March 2020 - BIM 360 Release Notes","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#primaryimage"},"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg","datePublished":"2020-03-24T12:25:08+00:00","dateModified":"2020-04-22T14:03:39+00:00","author":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca"},"breadcrumb":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#primaryimage","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2020\/03\/Cost-Updates-Release-Notes-Thumbnail-scaled.jpg","width":2560,"height":1741},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2020\/03\/24\/bim-360-cost-management-updates-march-2020\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/"},{"@type":"ListItem","position":2,"name":"BIM 360 Cost Management Updates &#8211; March 2020"}]},{"@type":"WebSite","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/","name":"BIM 360 Release Notes","description":"Updates and enhancements","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca","name":"Ian Turner","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","caption":"Ian Turner"},"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/author\/ianturner\/"}]}},"_links":{"self":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/2000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/users\/22366"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/comments?post=2000"}],"version-history":[{"count":0,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/2000\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media\/2060"}],"wp:attachment":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media?parent=2000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/categories?post=2000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/tags?post=2000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}