{"id":3202,"date":"2023-07-18T15:41:24","date_gmt":"2023-07-18T15:41:24","guid":{"rendered":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?p=3202"},"modified":"2023-07-18T19:04:08","modified_gmt":"2023-07-18T19:04:08","slug":"bim-360-cost-management-july-2023","status":"publish","type":"post","link":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/","title":{"rendered":"BIM 360 Cost Management &#8211; July 2023"},"content":{"rendered":"<h5><b><span data-contrast=\"none\"><i data-stringify-type=\"italic\">Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management.<\/i><\/span><\/b><\/h5>\n<h1><b><span data-contrast=\"none\">COST TOOL<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h1>\n<ul>\n<li data-leveltext=\"\u00b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\u00b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Materials Previously Billed in Payment Applications \u2013<\/span><\/b><span data-contrast=\"none\"> With the correct permission level, Project Admins now have additional flexibility when calculating materials on-site in payment applications. The new option allows users to treat materials on site as \u2018previously billed\u2019 and eliminates the need to manually move them if the user needs to show them as work completed the following month regardless of whether completed or still in storage. <\/span><span data-ccp-props=\"{}\"><br \/>\nTo access the new option:<\/span><\/p>\n<ul>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span data-contrast=\"none\">Go to Settings Tool in Cost Management<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span data-contrast=\"none\">Select General tab and open Materials in payment applications section<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span data-contrast=\"none\">Select the new method \u201cMaterials Billed\u201d which shows both materials to be billed in the current period and materials previously billed.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span data-contrast=\"none\">The setting cannot be changed once any payment application is created.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span data-contrast=\"none\">Note: \u201cMaterials on site\u201d is the current default option that is still available and has not been changed. <\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3203 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/Materials-Billed-1024x588.jpg\" alt=\"\" width=\"640\" height=\"368\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/Materials-Billed-1024x588.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/Materials-Billed-300x172.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/Materials-Billed-768x441.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/Materials-Billed.jpg 1535w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3212 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Materials-in-Payapps-1024x432.jpg\" alt=\"\" width=\"640\" height=\"270\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Materials-in-Payapps-1024x432.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Materials-in-Payapps-300x127.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Materials-in-Payapps-768x324.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Materials-in-Payapps-1536x648.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Materials-in-Payapps.jpg 1597w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong><span class=\"TextRun SCXW239218304 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW239218304 BCX8\">Budget Only <\/span><span class=\"NormalTextRun SCXW239218304 BCX8\">C<\/span><span class=\"NormalTextRun SCXW239218304 BCX8\">ost <\/span><span class=\"NormalTextRun SCXW239218304 BCX8\">items inc<\/span><span class=\"NormalTextRun SCXW239218304 BCX8\">lu<\/span><span class=\"NormalTextRun SCXW239218304 BCX8\">ded in a<\/span><span class=\"NormalTextRun SCXW239218304 BCX8\"> collaborative <\/span><span class=\"NormalTextRun SCXW239218304 BCX8\">PCO<\/span><\/span><\/strong><span class=\"TextRun SCXW239218304 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"> <span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW239218304 BCX8\">\u2013<\/span> <\/span><span class=\"TextRun SCXW239218304 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">Collaborative access PCOs have a restriction that only cost items connected to budgets associated with the s<\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">ame contract can be added. <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">Users can now <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">also <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">add <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">cost items connected to <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">budget-only <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">scope budget <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">items <\/span><\/span><span class=\"TextRun SCXW239218304 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">into a <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">collaborative <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\">PCO<\/span><span class=\"NormalTextRun CommentHighlightRest SCXW239218304 BCX8\"> to pay for any cost changes.<\/span><\/span><span class=\"EOP CommentHighlightPipeRest SCXW239218304 BCX8\" data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3205 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/reqqq.jpg\" alt=\"\" width=\"645\" height=\"129\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/reqqq.jpg 645w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/reqqq-300x60.jpg 300w\" sizes=\"auto, (max-width: 645px) 100vw, 645px\" \/><\/p>\n<h1><strong>REQUIRED FIELDS<\/strong><\/h1>\n<ul>\n<li>Users now have the option in settings to make required fields mandatory when creating contracts or change orders. This helps ensure all changes are compliant with company preferred best practices when submitted.To activate required fields for Change Orders\n<ul>\n<li>Go to Settings tool in Cost Management<\/li>\n<li>Under the Change Order tabs, click Required fields<\/li>\n<li>Choose from the drop-down menu.<\/li>\n<li>For change order, the following required fields can be set mandatory.\n<ul>\n<li>Type<\/li>\n<li>Description<\/li>\n<li>Schedule Change<\/li>\n<li>Scope of Work<\/li>\n<li>Custom Attributes<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3206 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/CO-1024x462.jpg\" alt=\"\" width=\"640\" height=\"289\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/CO-1024x462.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/CO-300x135.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/CO-768x346.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/CO-1536x693.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/07\/CO.jpg 1920w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul style=\"font-weight: 400\">\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span data-contrast=\"none\">When a change order is submitted, an error message will appear when a required field is not filled out.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"2\"><span data-contrast=\"none\">Users can fill out the required fields by selecting the change order item and editing in the flyout panel.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3209 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/2023-07-06_10-17-47-1024x462.jpg\" alt=\"\" width=\"640\" height=\"289\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/2023-07-06_10-17-47-1024x462.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/2023-07-06_10-17-47-300x135.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/2023-07-06_10-17-47-768x346.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/2023-07-06_10-17-47-1536x693.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/2023-07-06_10-17-47.jpg 1920w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><br \/>\nTo activate required fields for Contracts:<\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"2\"><span data-contrast=\"none\">Go to Settings tool in Cost Management<\/span><\/li>\n<li><span data-contrast=\"none\">Go to Settings tool in Cost Management<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"2\"><span data-contrast=\"none\">Under the Cost tab, click Required fields<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"3\" data-aria-level=\"2\"><span data-contrast=\"none\">Choose from the drop-down menu.<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"2\"><span data-contrast=\"none\">For Contract, the following required fields can be set mandatory:<\/span>\n<ul>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"2\"><span data-contrast=\"none\">Type<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"2\"><span data-contrast=\"none\">Awarded date<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"2\"><span data-contrast=\"none\">On site date<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"2\"><span data-contrast=\"none\">Off Site date\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"4\" data-aria-level=\"2\"><span data-contrast=\"none\">Custom Attributes\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3208 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Required-Fields-Contracts-1024x446.jpg\" alt=\"\" width=\"640\" height=\"279\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Required-Fields-Contracts-1024x446.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Required-Fields-Contracts-300x131.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Required-Fields-Contracts-768x334.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Required-Fields-Contracts-1536x668.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Required-Fields-Contracts.jpg 1912w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul style=\"font-weight: 400\">\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span data-contrast=\"none\">When a contract is submitted, an error message will appear when required fields are not filled out.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"1\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"2\"><span data-contrast=\"none\">Users can fill out mandatory fields by selecting the contract item and editing in the flyout panel.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3210 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Chnage-order-1-1024x462.jpg\" alt=\"\" width=\"640\" height=\"289\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Chnage-order-1-1024x462.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Chnage-order-1-300x135.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Chnage-order-1-768x346.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Chnage-order-1-1536x693.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Chnage-order-1.jpg 1920w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><b><span data-contrast=\"auto\">Editable Fields for Executed<\/span><\/b><b><span data-contrast=\"auto\">\/Integration locked Budget and Contracts<\/span><\/b>\n<ul>\n<li>Budgets that have been locked by an integration now have the following editable fields:\n<ul>\n<li><span data-contrast=\"auto\">Scope<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Description<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Location<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Custom Attributes<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Budget Name<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><span data-ccp-props=\"{&quot;335559685&quot;:0}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li><span data-contrast=\"auto\">Contract <\/span><span data-contrast=\"auto\">\u2013<\/span> <span data-contrast=\"auto\">with <\/span><span data-contrast=\"auto\">Executed Status\/Integration Lock<\/span><span data-contrast=\"auto\"> now have the following editable fields:<\/span>\n<ul>\n<li><span data-contrast=\"auto\">Type<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Supplier Contact<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">SOV (can be added using excel import)<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Linked References<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Retention Cap<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Custom Attributes<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Notes<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Comments<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><span data-ccp-props=\"{}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p><i data-stringify-type=\"italic\">Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management.<\/i><br \/>\nCOST TOOL\u00a0<\/p>\n<ul>\n<li data-leveltext=\"\u00b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\u00b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\">Materials Previously Billed in Payment Applications \u2013 With the correct permission level, Project Admins now have additional flexibility when calculating materials on-site in payment applications. The new option allows users to treat materials on site as \u2018previously billed\u2019 and eliminates the need to manually move them if the user needs to show them as work completed the following month regardless of whether completed or still in storage.<\/li>\n<\/ul>\n","protected":false},"author":22366,"featured_media":3213,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[81],"tags":[],"class_list":["post-3202","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cost-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BIM 360 Cost Management - July 2023 - BIM 360 Release Notes<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM 360 Cost Management - July 2023 - BIM 360 Release Notes\" \/>\n<meta property=\"og:description\" content=\"Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management. COST TOOL\u00a0 Materials Previously Billed in Payment Applications \u2013 With the correct permission level, Project Admins now have additional flexibility when calculating materials on-site in payment applications. The new option allows users to treat materials on site as \u2018previously billed\u2019 and eliminates the need to manually move them if the user needs to show them as work completed the following month regardless of whether completed or still in storage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/\" \/>\n<meta property=\"og:site_name\" content=\"BIM 360 Release Notes\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-18T15:41:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-18T19:04:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Pay-app-Materials-billed.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1916\" \/>\n\t<meta property=\"og:image:height\" content=\"830\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ian Turner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Turner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/\"},\"author\":{\"name\":\"Ian Turner\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\"},\"headline\":\"BIM 360 Cost Management &#8211; July 2023\",\"datePublished\":\"2023-07-18T15:41:24+00:00\",\"dateModified\":\"2023-07-18T19:04:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/\"},\"wordCount\":486,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/07\\\/13\\\/Pay-app-Materials-billed.jpg\",\"articleSection\":[\"Cost Management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/\",\"name\":\"BIM 360 Cost Management - July 2023 - BIM 360 Release Notes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/07\\\/13\\\/Pay-app-Materials-billed.jpg\",\"datePublished\":\"2023-07-18T15:41:24+00:00\",\"dateModified\":\"2023-07-18T19:04:08+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/07\\\/13\\\/Pay-app-Materials-billed.jpg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/07\\\/13\\\/Pay-app-Materials-billed.jpg\",\"width\":1916,\"height\":830},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/07\\\/18\\\/bim-360-cost-management-july-2023\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM 360 Cost Management &#8211; July 2023\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\",\"name\":\"BIM 360 Release Notes\",\"description\":\"Updates and enhancements\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\",\"name\":\"Ian Turner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"caption\":\"Ian Turner\"},\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/author\\\/ianturner\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BIM 360 Cost Management - July 2023 - BIM 360 Release Notes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/","og_locale":"en_US","og_type":"article","og_title":"BIM 360 Cost Management - July 2023 - BIM 360 Release Notes","og_description":"Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management. COST TOOL\u00a0 Materials Previously Billed in Payment Applications \u2013 With the correct permission level, Project Admins now have additional flexibility when calculating materials on-site in payment applications. The new option allows users to treat materials on site as \u2018previously billed\u2019 and eliminates the need to manually move them if the user needs to show them as work completed the following month regardless of whether completed or still in storage.","og_url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/","og_site_name":"BIM 360 Release Notes","article_published_time":"2023-07-18T15:41:24+00:00","article_modified_time":"2023-07-18T19:04:08+00:00","og_image":[{"width":1916,"height":830,"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Pay-app-Materials-billed.jpg","type":"image\/jpeg"}],"author":"Ian Turner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ian Turner","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#article","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/"},"author":{"name":"Ian Turner","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca"},"headline":"BIM 360 Cost Management &#8211; July 2023","datePublished":"2023-07-18T15:41:24+00:00","dateModified":"2023-07-18T19:04:08+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/"},"wordCount":486,"commentCount":0,"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Pay-app-Materials-billed.jpg","articleSection":["Cost Management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/","name":"BIM 360 Cost Management - July 2023 - BIM 360 Release Notes","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#primaryimage"},"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Pay-app-Materials-billed.jpg","datePublished":"2023-07-18T15:41:24+00:00","dateModified":"2023-07-18T19:04:08+00:00","author":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca"},"breadcrumb":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#primaryimage","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Pay-app-Materials-billed.jpg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/07\/13\/Pay-app-Materials-billed.jpg","width":1916,"height":830},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/07\/18\/bim-360-cost-management-july-2023\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/"},{"@type":"ListItem","position":2,"name":"BIM 360 Cost Management &#8211; July 2023"}]},{"@type":"WebSite","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/","name":"BIM 360 Release Notes","description":"Updates and enhancements","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca","name":"Ian Turner","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","caption":"Ian Turner"},"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/author\/ianturner\/"}]}},"_links":{"self":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/3202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/users\/22366"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/comments?post=3202"}],"version-history":[{"count":0,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/3202\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media\/3213"}],"wp:attachment":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media?parent=3202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/categories?post=3202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/tags?post=3202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}