{"id":3222,"date":"2023-09-19T15:27:51","date_gmt":"2023-09-19T15:27:51","guid":{"rendered":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?p=3222"},"modified":"2023-09-19T15:27:51","modified_gmt":"2023-09-19T15:27:51","slug":"bim-360-cost-management-september-2023","status":"publish","type":"post","link":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/","title":{"rendered":"BIM 360 Cost Management &#8211; September 2023"},"content":{"rendered":"<h5><b><span data-contrast=\"none\"><i data-stringify-type=\"italic\">Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management.<\/i><\/span><\/b><\/h5>\n<p>&nbsp;<\/p>\n<h1><b><span data-contrast=\"none\">COST TOOL<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h1>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Automated Retention Cap Adjustment<\/span><\/b><span data-contrast=\"none\"> \u2013 For users that utilize capped retention, when a cost payment application accept\/proceed button is selected, the system auto-checks the retention cap. If exceeded, users will see a warning message appear and an orange triangle in the Total Retained column.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{}\"> <img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3223 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost--1024x431.jpg\" alt=\"\" width=\"640\" height=\"269\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost--1024x431.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost--300x126.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost--768x323.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost--763x320.jpg 763w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost-.jpg 1460w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/span><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">Selecting the orange triangle in the Total Retained column provides 2 options:<\/span><span data-ccp-props=\"{}\">\u00a0<\/span>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">Adjust total retained amount to the calculated cap amount which will auto calculate and apply the correct retention % to be applied to completed work.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">Members can also edit the retention cap limit if needed.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;335551550&quot;:2,&quot;335551620&quot;:2}\"> <img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3224 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Orange-Triangle-1024x299.jpg\" alt=\"\" width=\"640\" height=\"187\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Orange-Triangle-1024x299.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Orange-Triangle-300x87.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Orange-Triangle-768x224.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Orange-Triangle.jpg 1499w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Relaxed Locked Field Restrictions of Executed or Integration Locked Contract &amp; Change Orders <\/span><\/b><span data-contrast=\"none\">\u2013 In the flyout panel, some fields were previously locked down once the status was set as executed or integration locked. Members can now edit the fields without reverting the status. This is beneficial when a contract is already signed and a supplier&#8217;s contact for a Subcontract has changed, members can easily assign the contract to a different contact.\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;335551550&quot;:2,&quot;335551620&quot;:2}\"> <img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3225 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Relaxed-1024x491.jpg\" alt=\"\" width=\"640\" height=\"307\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Relaxed-1024x491.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Relaxed-300x144.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Relaxed-768x368.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Relaxed.jpg 1100w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/span><\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/p>\n<h1><b><span data-contrast=\"none\">CHANGE ORDER TOOL\u00a0<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h1>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Show Associated Change Order Number at Summary Level in every Change Order Table View Report \u2013 <\/span><\/b><span data-contrast=\"none\"><span data-contrast=\"none\">For all change order cost items, users have an option to turn on PCO, RFQ, COR, OCO, and SCO columns to see the associated number\/links in the user interface. Now, for all reports, if the columns are turned on, members can view the associated numbers at the summary change order level and cost item level, depending on visibility choice selected.<\/span><\/span><\/li>\n<\/ul>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"4\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><b><span data-contrast=\"none\">PCO Collaborate Access: Ability to select Cost Items for Scope of Work in RFQ\u2019s \u2013 <\/span><\/b><span data-contrast=\"none\">When using \u2018Potential Change Order to request quotations\u2019 option is turned on in project process settings, members with full control access can now send an empty PCO for pricing.<\/span> <span data-contrast=\"none\">Responders with PCO collaborate access can now pick and choose the cost items. This workflow is particularly beneficial in scenarios<\/span> <span data-contrast=\"none\">such as an Owner requesting pricing to a GC whose scope covers many different trades, letting them select only the relative items to respond to the RFQ.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;335551550&quot;:2,&quot;335551620&quot;:2}\"> <img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3226 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Null-1024x570.jpg\" alt=\"\" width=\"640\" height=\"356\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Null-1024x570.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Null-300x167.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Null-768x427.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Null.jpg 1100w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;335551550&quot;:2,&quot;335551620&quot;:2}\">\u00a0<\/span><\/p>\n<ul>\n<li><b><span data-contrast=\"none\">Change Order Schedule Change Field Null vs Zero \u2013 <\/span><\/b><span data-contrast=\"none\">Behavior of the Schedule Change Field in the flyout panel has been updated to differentiate between null status\/empty value vs 0 value. Members can now use a variable that allows to populate \u2018TBD\u2019 in the document if schedule change is still unknown or populate actual numbers if entered.<\/span>{oco.scheduleChange === null? \u201cTBD\u201d : oco.scheduleChange} days<span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;335551550&quot;:2,&quot;335551620&quot;:2}\"> <img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3227 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Change-Order-1024x411.jpg\" alt=\"\" width=\"640\" height=\"257\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Change-Order-1024x411.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Change-Order-300x121.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Change-Order-768x309.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Change-Order.jpg 1100w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;335551550&quot;:2,&quot;335551620&quot;:2}\">\u00a0<\/span><\/p>\n<h1><b><span data-contrast=\"none\">FORECAST TOOL<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h1>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Cash Flow Distribution Enhancements \u2013 <\/span><\/b><span data-contrast=\"none\">New distribution options are now available to Project Admins within the Forecast\/Cashflow settings page.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">Members can now choose distribution items based on budget code segments, or contracts.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">Members can distribute at a grouped level and reduce the number of line items<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">Members now have a centralized place to create and manage all cash flow distributions. This is done within the Cash Flow tab in the Forecast Tool.<\/span><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"none\">Connections between budget and schedule tasks are still made in the Cost &amp; Time view and start and end dates carried forward.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<div style=\"width: 640px;\" class=\"wp-video\"><video class=\"wp-video-shortcode\" id=\"video-3222-1\" width=\"640\" height=\"360\" preload=\"metadata\" controls=\"controls\"><source type=\"video\/mp4\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/15\/Cash-Flow-Sep-23.mp4?_=1\" \/><a href=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/15\/Cash-Flow-Sep-23.mp4\">https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/15\/Cash-Flow-Sep-23.mp4<\/a><\/video><\/div>\n<h1><\/h1>\n<h1><\/h1>\n<h1><b><span data-contrast=\"none\">SETTINGS<\/span><\/b><\/h1>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Compliance requirement expiration date appears on Home Page &#8211; <\/span><\/b><span data-contrast=\"none\">Members now have the ability to choose whether to display document expiration dates of compliance requirements on the Home page. This option is managed within settings; use the toggle to turn on\/off. The toggle is on by default, does not change the existing behavior.<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;335551550&quot;:2,&quot;335551620&quot;:2}\"> <img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3231 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost-pay-app-1024x583.jpg\" alt=\"\" width=\"640\" height=\"364\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost-pay-app-1024x583.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost-pay-app-300x171.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost-pay-app-768x437.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/Cost-pay-app.jpg 1399w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p><i data-stringify-type=\"italic\">Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management.<\/i><\/p>\n<p>&nbsp;<\/p>\n<p>COST TOOL\u00a0<\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"6\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\">Automated Retention Cap Adjustment \u2013 For users that utilize capped retention, when a cost payment application accept\/proceed button is selected, the system auto-checks the retention cap.<\/li>\n<\/ul>\n","protected":false},"author":70973,"featured_media":3229,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[81],"tags":[109],"class_list":["post-3222","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cost-management","tag-bim-360-cost-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BIM 360 Cost Management - September 2023 - BIM 360 Release Notes<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM 360 Cost Management - September 2023 - BIM 360 Release Notes\" \/>\n<meta property=\"og:description\" content=\"Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management. &nbsp; COST TOOL\u00a0 Automated Retention Cap Adjustment \u2013 For users that utilize capped retention, when a cost payment application accept\/proceed button is selected, the system auto-checks the retention cap.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/\" \/>\n<meta property=\"og:site_name\" content=\"BIM 360 Release Notes\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-19T15:27:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/DB.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"937\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"yoetzindiaz\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"yoetzindiaz\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/\"},\"author\":{\"name\":\"yoetzindiaz\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/07b0cd97c189beaa897f69c92f8c39d3\"},\"headline\":\"BIM 360 Cost Management &#8211; September 2023\",\"datePublished\":\"2023-09-19T15:27:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/\"},\"wordCount\":588,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/09\\\/12\\\/DB.jpg\",\"keywords\":[\"BIM 360 Cost Management\"],\"articleSection\":[\"Cost Management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/\",\"name\":\"BIM 360 Cost Management - September 2023 - BIM 360 Release Notes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/09\\\/12\\\/DB.jpg\",\"datePublished\":\"2023-09-19T15:27:51+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/07b0cd97c189beaa897f69c92f8c39d3\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/09\\\/12\\\/DB.jpg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/09\\\/12\\\/DB.jpg\",\"width\":1920,\"height\":937},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2023\\\/09\\\/19\\\/bim-360-cost-management-september-2023\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM 360 Cost Management &#8211; September 2023\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\",\"name\":\"BIM 360 Release Notes\",\"description\":\"Updates and enhancements\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/07b0cd97c189beaa897f69c92f8c39d3\",\"name\":\"yoetzindiaz\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/584a1e2ec76bef6649d331905645a88b2b4ac3be90f521c0e844cb94962422d9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/584a1e2ec76bef6649d331905645a88b2b4ac3be90f521c0e844cb94962422d9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/584a1e2ec76bef6649d331905645a88b2b4ac3be90f521c0e844cb94962422d9?s=96&d=mm&r=g\",\"caption\":\"yoetzindiaz\"},\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/author\\\/yoetzindiaz\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BIM 360 Cost Management - September 2023 - BIM 360 Release Notes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/","og_locale":"en_US","og_type":"article","og_title":"BIM 360 Cost Management - September 2023 - BIM 360 Release Notes","og_description":"Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management. &nbsp; COST TOOL\u00a0 Automated Retention Cap Adjustment \u2013 For users that utilize capped retention, when a cost payment application accept\/proceed button is selected, the system auto-checks the retention cap.","og_url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/","og_site_name":"BIM 360 Release Notes","article_published_time":"2023-09-19T15:27:51+00:00","og_image":[{"width":1920,"height":937,"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/DB.jpg","type":"image\/jpeg"}],"author":"yoetzindiaz","twitter_card":"summary_large_image","twitter_misc":{"Written by":"yoetzindiaz","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#article","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/"},"author":{"name":"yoetzindiaz","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/07b0cd97c189beaa897f69c92f8c39d3"},"headline":"BIM 360 Cost Management &#8211; September 2023","datePublished":"2023-09-19T15:27:51+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/"},"wordCount":588,"commentCount":0,"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/DB.jpg","keywords":["BIM 360 Cost Management"],"articleSection":["Cost Management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/","name":"BIM 360 Cost Management - September 2023 - BIM 360 Release Notes","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#primaryimage"},"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/DB.jpg","datePublished":"2023-09-19T15:27:51+00:00","author":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/07b0cd97c189beaa897f69c92f8c39d3"},"breadcrumb":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#primaryimage","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/DB.jpg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/09\/12\/DB.jpg","width":1920,"height":937},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2023\/09\/19\/bim-360-cost-management-september-2023\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/"},{"@type":"ListItem","position":2,"name":"BIM 360 Cost Management &#8211; September 2023"}]},{"@type":"WebSite","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/","name":"BIM 360 Release Notes","description":"Updates and enhancements","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/07b0cd97c189beaa897f69c92f8c39d3","name":"yoetzindiaz","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/584a1e2ec76bef6649d331905645a88b2b4ac3be90f521c0e844cb94962422d9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/584a1e2ec76bef6649d331905645a88b2b4ac3be90f521c0e844cb94962422d9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/584a1e2ec76bef6649d331905645a88b2b4ac3be90f521c0e844cb94962422d9?s=96&d=mm&r=g","caption":"yoetzindiaz"},"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/author\/yoetzindiaz\/"}]}},"_links":{"self":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/3222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/users\/70973"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/comments?post=3222"}],"version-history":[{"count":0,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/3222\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media\/3229"}],"wp:attachment":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media?parent=3222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/categories?post=3222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/tags?post=3222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}