{"id":3258,"date":"2024-01-23T15:06:31","date_gmt":"2024-01-23T15:06:31","guid":{"rendered":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?p=3258"},"modified":"2024-02-01T18:30:41","modified_gmt":"2024-02-01T18:30:41","slug":"bim-360-cost-management-january-2024","status":"publish","type":"post","link":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/","title":{"rendered":"BIM 360 Cost Management &#8211; January 2024"},"content":{"rendered":"<h5><i>Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management.<\/i><\/h5>\n<h2><b><span data-contrast=\"none\">BUDGET TOOL<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h2>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Add Optional Scope Field in Budget Import<\/span><\/b><span data-contrast=\"none\"><span data-contrast=\"none\">\u2013 <\/span><\/span>A new Scope column has been added to the Excel Budget import template to remove the need to set the Scope field in Cost Management manually if preferred. Now, in the template, if a Scope cell includes &#8220;Budget Only&#8221; (case sensitive) the system auto-sets the &#8216;Scope&#8217; field in Cost Management as &#8220;Budget Only.&#8221; If the cell is left empty or is not precisely &#8220;Budget Only,&#8221; the system will set the &#8216;Scope&#8217; field to the default option, &#8220;Budget and Cost.&#8221;<span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{}\"> <img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3259 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-1.jpg\" alt=\"\" width=\"720\" height=\"76\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-1.jpg 720w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-1-300x32.jpg 300w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3260 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-2.jpg\" alt=\"\" width=\"480\" height=\"294\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-2.jpg 480w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-2-300x184.jpg 300w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h2><b><span data-contrast=\"none\">COST TOOL<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h2>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\"><b><span data-contrast=\"auto\">Document Generation Add Previous Payment Application Variables to Current Payment Application- <\/span><\/b>To help process &#8216;conditional&#8217; and &#8216;unconditional&#8217; lien waivers, in the pay app document template, members can now include information from the previous payment application into the current month&#8217;s payment application, such as application number, last period end date, and payment due.\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"1\">See variables below:<br \/>\n{previousPayment.number}<br \/>\n{previousPayment.endDate}<br \/>\n{previousPayment.currentPayment}<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ul>\n<li><span class=\"TextRun SCXW133952635 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"><strong><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW133952635 BCX8\">Document<\/span><span class=\"NormalTextRun CommentHighlightPipeRest SCXW133952635 BCX8\"> Generation Variable for Cost\/Budget Pay App<\/span><\/strong><span class=\"NormalTextRun SCXW133952635 BCX8\"> \u2013<\/span><\/span> A new document generation variable is available for members to gather the unit quantity of change orders for their cost\/budget payment applications.\n<ul>\n<li><span class=\"TextRun SCXW133952635 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW133952635 BCX8\">See variable below:<br \/>\n<\/span><span class=\"NormalTextRun SCXW133952635 BCX8\">{<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW133952635 BCX8\">payment.columnView.changeOrderQuantity<\/span><span class=\"NormalTextRun SCXW133952635 BCX8\">}.<\/span><\/span><span class=\"EOP SCXW133952635 BCX8\" data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3261 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-3-1024x339.jpg\" alt=\"\" width=\"640\" height=\"212\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-3-1024x339.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-3-300x99.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-3-768x254.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-3.jpg 1256w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong><strong><span class=\"TextRun SCXW227339998 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW227339998 BCX8\">Generating<\/span><span class=\"NormalTextRun CommentHighlightPipeRest SCXW227339998 BCX8\"> and Sending Documents from Template<\/span><span class=\"NormalTextRun SCXW227339998 BCX8\">&#8211;<\/span><\/span> <\/strong><\/strong>Members with full control can now send additional documents beyond the single document package allowed today in all views of document generation, e.g. a letter of intent or a notice of default that requires sending before or after the subcontract package is sent.\n<ul>\n<li>Members can access through the attachment section in the flyout and send as individual documents.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3262 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-4.jpg\" alt=\"\" width=\"480\" height=\"440\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-4.jpg 480w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-4-300x275.jpg 300w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong><span class=\"TextRun SCXW231659442 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentStart SCXW231659442 BCX8\">Allow<\/span><span class=\"NormalTextRun SCXW231659442 BCX8\"> Multiple Payment Applications in a Billing Period<\/span><\/span><\/strong><span class=\"TextRun SCXW231659442 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"> <span class=\"NormalTextRun SCXW231659442 BCX8\">\u2013 <\/span><span class=\"NormalTextRun SCXW231659442 BCX8\">Members can now<\/span><span class=\"NormalTextRun SCXW231659442 BCX8\"> generate multiple <\/span><span class=\"NormalTextRun SCXW231659442 BCX8\">(5) <\/span><span class=\"NormalTextRun SCXW231659442 BCX8\">payment applications in a billing period. <\/span><span class=\"NormalTextRun SCXW231659442 BCX8\">This is beneficial<\/span><span class=\"NormalTextRun SCXW231659442 BCX8\"> in <\/span><\/span><span class=\"TextRun SCXW231659442 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW231659442 BCX8\">scenarios such as making advanced payment<\/span><span class=\"NormalTextRun SCXW231659442 BCX8\">s, releasing retention separately, and creating net adjustments retrospectively.\u00a0<\/span><\/span><span class=\"EOP SCXW231659442 BCX8\" data-ccp-props=\"{}\">\u00a0<\/span>\n<ul>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"2\" data-aria-level=\"2\"><span data-contrast=\"none\">To add multiple pay apps in a period, members can select the plus sign within the Manage billing period dropdown.\u00a0<\/span><span data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"5\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"3\" data-aria-level=\"2\"><span data-contrast=\"none\">The pay apps are calculated based on time\/date order of creation and must be approved in this same order.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3287 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-29_09-27-30-1024x479.jpg\" alt=\"\" width=\"640\" height=\"299\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-29_09-27-30-1024x479.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-29_09-27-30-300x140.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-29_09-27-30-768x359.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-29_09-27-30-1536x718.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-29_09-27-30.jpg 1903w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li><span class=\"TextRun SCXW82495164 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW82495164 BCX8\">M<\/span><span class=\"NormalTextRun CommentStart SCXW82495164 BCX8\">embers can <\/span><span class=\"NormalTextRun SCXW82495164 BCX8\">delete<\/span><span class=\"NormalTextRun SCXW82495164 BCX8\"> pay apps within a billing period. If a pay app in the middle of two others is <\/span><span class=\"NormalTextRun SCXW82495164 BCX8\">deleted<\/span> <span class=\"NormalTextRun SCXW82495164 BCX8\">user<\/span><span class=\"NormalTextRun SCXW82495164 BCX8\"> will need to select the \u201cUpdate value from previous application\u201d button to recalculate \u2018From Previous Application\u2019 values.<\/span><span class=\"NormalTextRun SCXW82495164 BCX8\">\u00a0<\/span><\/span><span class=\"EOP SCXW82495164 BCX8\" data-ccp-props=\"{}\">\u00a0<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3288 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-10_18-33-43-1024x247.jpg\" alt=\"\" width=\"640\" height=\"154\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-10_18-33-43-1024x247.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-10_18-33-43-300x72.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-10_18-33-43-768x186.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-10_18-33-43-1536x371.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/2024-01-10_18-33-43.jpg 1734w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3289 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/Picture2-1024x350.jpg\" alt=\"\" width=\"640\" height=\"219\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/Picture2-1024x350.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/Picture2-300x103.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/Picture2-768x263.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/Picture2.jpg 1328w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2><b><span data-contrast=\"none\">CHANGE ORDER TOOL<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h2>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"7\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Change Order Usability Enhancements<\/span><\/b><span data-contrast=\"none\">\u2013\u00a0<\/span>Several usability enhancements have been added to the Change Order tool to help improve change order management, including:<span data-contrast=\"none\"><br \/>\n<\/span><\/p>\n<ul>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><b><span data-contrast=\"none\">New \u2018Contracted\u2019 cost status &#8211;<\/span><\/b><span data-contrast=\"none\"><span data-contrast=\"none\"><span data-contrast=\"none\"><span data-contrast=\"none\"> A new \u2018Contracted\u2019 cost status has been added for cost items for members to indicate when a new contract has been generated.<\/span><\/span><\/span><\/span><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3265 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-7-1024x459.jpg\" alt=\"\" width=\"640\" height=\"287\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-7-1024x459.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-7-300x135.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-7-768x344.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-7.jpg 1171w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/li>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><strong><span class=\"TextRun SCXW67210013 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW67210013 BCX8\">New <\/span><span class=\"NormalTextRun CommentHighlightRest SCXW67210013 BCX8\">\u2018Void\u2019 status<\/span><\/span><\/strong><span class=\"TextRun SCXW67210013 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"TextRun SCXW67210013 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentHighlightPipeRest SCXW67210013 BCX8\"> \u2013 To track potential change orders events, but not have the cost tracked within the budget, members can now void a PCO and all its cost items with the new &#8216;Void&#8217; option while still providing comments for the reason for the void operation.<br \/>\n<\/span><\/span><\/span><br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3266 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-8-1024x525.jpg\" alt=\"\" width=\"640\" height=\"328\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-8-1024x525.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-8-300x154.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-8-768x394.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-8.jpg 1100w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3267 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-9.jpg\" alt=\"\" width=\"360\" height=\"176\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-9.jpg 360w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-9-300x147.jpg 300w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li data-leveltext=\"o\" data-font=\"Courier New\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:1440,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Courier New&quot;,&quot;469769242&quot;:[9675],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;o&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"2\"><span class=\"TextRun SCXW67210013 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW67210013 BCX8\"><span class=\"TextRun SCXW127931769 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW127931769 BCX8\">Members can re-open a voided PCO upon a potential change event as needed. <\/span><\/span><span class=\"EOP SCXW127931769 BCX8\" data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\"><br \/>\n<\/span>\u00a0<\/span><\/span><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3268 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-10-1024x482.jpg\" alt=\"\" width=\"640\" height=\"301\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-10-1024x482.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-10-300x141.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-10-768x362.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-10.jpg 1100w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong><span class=\"TextRun SCXW237376599 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW237376599 BCX8\">Change Order Mark-Up Consolidation and Document Generation<\/span><\/span><\/strong><span class=\"TextRun SCXW237376599 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"TextRun SCXW237376599 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><strong><span class=\"NormalTextRun CommentHighlightRest SCXW237376599 BCX8\"> \u2013<\/span><\/strong><span class=\"NormalTextRun CommentHighlightRest SCXW237376599 BCX8\"> The change order mark-up consolidation in document generation allows members to consolidate identical mark-ups from multiple change orders to a single item. Members will need to update all their existing document templates if they use this consolidation.<\/span><\/span><\/span>\n<ul>\n<li>See variables below:<br \/>\n{oco.markups| filter:\u201dname\u201d:Fee\u201d | sumBy: \u201capproved\u201d }<br \/>\n{oco,markups| filter:\u201dname\u201d:\u201danother Fee\u201d | sumBy: \u201capproved\u201d }<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3280 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/CO-MArk-up.jpg\" alt=\"\" width=\"480\" height=\"362\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/CO-MArk-up.jpg 480w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/CO-MArk-up-300x226.jpg 300w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3269 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-11-1024x687.jpg\" alt=\"\" width=\"640\" height=\"429\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-11-1024x687.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-11-300x201.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-11-768x515.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-11.jpg 1100w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong><span class=\"TextRun SCXW192474681 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW192474681 BCX8\">New<\/span><span class=\"NormalTextRun CommentHighlightPipeRest SCXW192474681 BCX8\"> Attachment Column for RFQs<\/span><\/span><\/strong><span class=\"TextRun SCXW192474681 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW192474681 BCX8\"><strong>&#8211;<\/strong> Members now have a<\/span><span class=\"NormalTextRun SCXW192474681 BCX8\"> visual indicator<\/span><span class=\"NormalTextRun SCXW192474681 BCX8\"> for better visibility<\/span><span class=\"NormalTextRun SCXW192474681 BCX8\"> for attachments in the RFQ table<\/span><span class=\"NormalTextRun SCXW192474681 BCX8\">.\u00a0<\/span><\/span><span class=\"EOP SCXW192474681 BCX8\" data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3270 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-12-1024x563.jpg\" alt=\"\" width=\"640\" height=\"352\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-12-1024x563.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-12-300x165.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-12-768x422.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-12.jpg 1189w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<ul>\n<li><strong><span class=\"TextRun SCXW9499276 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW9499276 BCX8\">Ability<\/span><span class=\"NormalTextRun CommentHighlightPipeRest SCXW9499276 BCX8\"> to Re-Open RFQ Cost Item Status \u2013<\/span><\/span><\/strong><span class=\"TextRun SCXW9499276 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"> <span class=\"NormalTextRun SCXW9499276 BCX8\">Previously, the batch requested RFQ cost items that were closed as no impact could not be <\/span><span class=\"NormalTextRun SCXW9499276 BCX8\">utilized<\/span><span class=\"NormalTextRun SCXW9499276 BCX8\"> for further actions in the system. Now, members can choose to \u2018re-open and propose quotation\u2019 <\/span><span class=\"NormalTextRun SCXW9499276 BCX8\">for the<\/span><span class=\"NormalTextRun SCXW9499276 BCX8\"> RFQ cost items that have been previously closed.<\/span><\/span><span class=\"EOP SCXW9499276 BCX8\" data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3271 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-13.jpg\" alt=\"\" width=\"480\" height=\"171\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-13.jpg 480w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-13-300x107.jpg 300w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h2><b><span data-contrast=\"none\">FORECAST TOOL<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/h2>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Cash Flow Consolidated View<\/span><\/b><span data-contrast=\"none\"> \u2013 Within the Cash Flow view, members can now make distribution modifications in a new sub-table view, allowing them to see the context of the other distribution items while making adjustments.\u00a0\u00a0<\/span>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\">To access the new sub-table, click the value listed in the distribution total column.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3281 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/Jan-24-cost-14--1024x484.jpg\" alt=\"\" width=\"640\" height=\"303\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/Jan-24-cost-14--1024x484.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/Jan-24-cost-14--300x142.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/Jan-24-cost-14--768x363.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/Jan-24-cost-14--1536x725.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/Jan-24-cost-14-.jpg 1906w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2><b><span data-contrast=\"none\">SETTINGS<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true}\">\u00a0<\/span><\/h2>\n<ul>\n<li><strong><span class=\"TextRun SCXW96323986 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW96323986 BCX8\">Contract<\/span><span class=\"NormalTextRun CommentHighlightPipeRest SCXW96323986 BCX8\"> Schedule of Values Amount Locked Setting<\/span><span class=\"NormalTextRun SCXW96323986 BCX8\"> \u2013<\/span><\/span><\/strong><span class=\"TextRun SCXW96323986 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"TextRun SCXW96323986 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"> This release relates to the November Contract Break Down SOV with Amount Locked release. Now, after a subcontract has been executed, Admins can change the Contract Schedule of Values setting in Settings from the default &#8216;Fully Locked&#8221; to &#8216;Amount Locked.&#8217; This allows members to edit the breakdown of the locked lump sum before the first cost payment application is executed.\u00a0<\/span><\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3274 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-16.jpg\" alt=\"\" width=\"869\" height=\"411\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-16.jpg 869w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-16-300x142.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-16-768x363.jpg 768w\" sizes=\"auto, (max-width: 869px) 100vw, 869px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><strong><span class=\"TextRun Highlight SCXW243677036 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW243677036 BCX8\">Setting<\/span><span class=\"NormalTextRun CommentHighlightRest SCXW243677036 BCX8\"> to Limit Adding Multiple Budget Codes to a Contract<\/span><span class=\"NormalTextRun CommentHighlightRest SCXW243677036 BCX8\">:<\/span><\/span><\/strong><span class=\"TextRun Highlight SCXW243677036 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"> <span class=\"NormalTextRun CommentHighlightPipeRest SCXW243677036 BCX8\">In cases where members want t<\/span><span class=\"NormalTextRun SCXW243677036 BCX8\">o limit adding multiple budget codes to a Contract, there is now a new <\/span><span class=\"NormalTextRun SCXW243677036 BCX8\">option<\/span><span class=\"NormalTextRun SCXW243677036 BCX8\"> within <\/span><span class=\"NormalTextRun SCXW243677036 BCX8\">S<\/span><span class=\"NormalTextRun SCXW243677036 BCX8\">ettings<\/span><span class=\"NormalTextRun SCXW243677036 BCX8\"> called <\/span><span class=\"NormalTextRun SCXW243677036 BCX8\">\u201cOne budget to one Contract\u201d for Budget and Contract allocation. This new setting ensures an<\/span><span class=\"NormalTextRun SCXW243677036 BCX8\">y of the accounting integrations <\/span><span class=\"NormalTextRun SCXW243677036 BCX8\">are not<\/span><span class=\"NormalTextRun SCXW243677036 BCX8\"> affected.<\/span><\/span><span class=\"TextRun SCXW243677036 BCX8\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW243677036 BCX8\">\u00a0<\/span><\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3286 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/One-budget-1024x691.jpg\" alt=\"\" width=\"640\" height=\"432\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/One-budget-1024x691.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/One-budget-300x202.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/One-budget-768x518.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/23\/One-budget.jpg 1100w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2><b><span data-contrast=\"none\">APPROVAL WORKFLOW ENHANCEMENTS\u00a0<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:true,&quot;134233118&quot;:true,&quot;201341983&quot;:0,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h2>\n<ul>\n<li><strong>Approval Workflow Enhancement Stages <\/strong>&#8211; In all approval workflows, within Setting in Cost Management, up to 12 stages are now available.<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3282 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/enhancement.jpg\" alt=\"\" width=\"480\" height=\"269\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/enhancement.jpg 480w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/enhancement-300x168.jpg 300w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/li>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"5\" data-aria-level=\"1\"><strong>Approval Workflow Enhancements<\/strong> &#8211; Admins can now adjust the due date for a given document review directly in the flyout after a project-wide approval workflow has been set.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3276 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-18-1024x354.jpg\" alt=\"\" width=\"640\" height=\"221\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-18-1024x354.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-18-300x104.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-18-768x265.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-18.jpg 1242w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><span class=\"NormalTextRun CommentStart CommentHighlightPipeRest CommentHighlightRest SCXW255600708 BCX8\"><strong>Contract Approval Workflow Enhancement<\/strong> &#8211; The<\/span><span class=\"NormalTextRun CommentHighlightPipeRest SCXW255600708 BCX8\"> second enhancement adds a<\/span><span class=\"NormalTextRun SCXW255600708 BCX8\">\u00a0trigger for Contract approval workflow if the <\/span><span class=\"NormalTextRun SCXW255600708 BCX8\">\u2018Schedule of Values Sum\u2019<\/span><span class=\"NormalTextRun SCXW255600708 BCX8\"> exceeds the Revised Budget. Admins can define within Settings.\u00a0<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3277 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-19-1024x250.jpg\" alt=\"\" width=\"640\" height=\"156\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-19-1024x250.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-19-300x73.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-19-768x187.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-19.jpg 1366w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li><span data-ccp-props=\"{&quot;335551550&quot;:2,&quot;335551620&quot;:2}\">\u00a0<strong>Approval Workflow: Collaborators as Reviewers<\/strong> &#8211; We are enhancing the flexibility of workflows and further streamlining processes by allowing users with collaborate access to be reviewers in approval workflows for OCO and budget payment app.<\/span>\n<ul>\n<li>For members using external collaborators in the workflow engine-based approval process:\n<ul>\n<li>Within Settings, grant collaborate permission to the external Collaborator companies to approve\/reject an OCO and budget pay app.<\/li>\n<li>Members must have an Autodesk Build-Cost Management license.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3283 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/2024-01-09_11-32-17-1024x499.jpg\" alt=\"\" width=\"640\" height=\"312\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/2024-01-09_11-32-17-1024x499.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/2024-01-09_11-32-17-300x146.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/2024-01-09_11-32-17-768x374.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/2024-01-09_11-32-17-1536x749.jpg 1536w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2024\/01\/19\/2024-01-09_11-32-17.jpg 1912w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<ul>\n<li style=\"list-style-type: none\">\n<ul>\n<li>For members using external collaborators outside of the workflow engine-based approval process:\n<ul>\n<li>Within Settings, grant collaborate permission to the external Collaborator companies to approve\/reject a COR\/OCO\/budget pay app.<\/li>\n<li>Within the flyout in the new section &#8216;Architects Details,&#8217; members can select the external Architect&#8217;s company user to request COR\/OCO approval.<\/li>\n<li>Within the flyout in the new section &#8216;Additional Collaborators.&#8217; members can add additional collaborative external users who are not part of the workflow engine-based approval processes, to be added as reviewers.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3273 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-15-1024x536.jpg\" alt=\"\" width=\"640\" height=\"335\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-15-1024x536.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-15-300x157.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-15-768x402.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-15.jpg 1170w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h2><b><span data-contrast=\"none\">DOCUMENT ATTACHMENTS<\/span><\/b><span data-ccp-props=\"{}\">\u00a0<\/span><\/h2>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"6\" data-aria-level=\"1\"><b><span data-contrast=\"none\">Document Attachments Included in Email Notifications<\/span><\/b><span data-contrast=\"none\">\u2013 Now, any Cost Management email notification with a document package\/attachment less than 20MB will automatically be attached to the email, giving members quicker access to the information. The link to the document(s) within the email will stay the same for access within Cost Management.<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3278 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-20-1024x133.jpg\" alt=\"\" width=\"640\" height=\"83\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-20-1024x133.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-20-300x39.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-20-768x99.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-20.jpg 1274w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3279 aligncenter\" src=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-21-1024x649.jpg\" alt=\"\" width=\"640\" height=\"406\" srcset=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-21-1024x649.jpg 1024w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-21-300x190.jpg 300w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-21-768x487.jpg 768w, https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-21.jpg 1253w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2><span data-ccp-props=\"{}\">COST KPI TEMPLATE<\/span><\/h2>\n<p>Now available new customizable cost based KPIs (Key Performance Indicators) templates to help identify\/deliver key performance indicators at a project and cross-project level. These are accessible via the data connector in the template gallery.<br \/>\n<strong>KPIs related to 6 cost aspects:\u00a0<\/strong><\/p>\n<ul>\n<li>Buyout<\/li>\n<li>Fee<\/li>\n<li>Contingency<\/li>\n<li>Change Orders<\/li>\n<li>Cash Flow<\/li>\n<li>Cost Variance<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p><i>Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management.<\/i><br \/>\nBUDGET TOOL\u00a0<\/p>\n<ul>\n<li data-leveltext=\"\uf0b7\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559684&quot;:-2,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf0b7&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\">Add Optional Scope Field in Budget Import\u2013 A new Scope column has been added to the Excel Budget import template to remove the need to set the Scope field in Cost Management manually if preferred.<\/li>\n<\/ul>\n","protected":false},"author":22366,"featured_media":3272,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[81,82],"tags":[109],"class_list":["post-3258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cost-management","category-project-controls","tag-bim-360-cost-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BIM 360 Cost Management - January 2024 - BIM 360 Release Notes<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM 360 Cost Management - January 2024 - BIM 360 Release Notes\" \/>\n<meta property=\"og:description\" content=\"Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management. BUDGET TOOL\u00a0 Add Optional Scope Field in Budget Import\u2013 A new Scope column has been added to the Excel Budget import template to remove the need to set the Scope field in Cost Management manually if preferred.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/\" \/>\n<meta property=\"og:site_name\" content=\"BIM 360 Release Notes\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-23T15:06:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-01T18:30:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-14.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"612\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ian Turner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Turner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/\"},\"author\":{\"name\":\"Ian Turner\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\"},\"headline\":\"BIM 360 Cost Management &#8211; January 2024\",\"datePublished\":\"2024-01-23T15:06:31+00:00\",\"dateModified\":\"2024-02-01T18:30:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/\"},\"wordCount\":1178,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/12\\\/20\\\/Jan-24-cost-14.jpg\",\"keywords\":[\"BIM 360 Cost Management\"],\"articleSection\":[\"Cost Management\",\"Project Controls\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/\",\"name\":\"BIM 360 Cost Management - January 2024 - BIM 360 Release Notes\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/12\\\/20\\\/Jan-24-cost-14.jpg\",\"datePublished\":\"2024-01-23T15:06:31+00:00\",\"dateModified\":\"2024-02-01T18:30:41+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/12\\\/20\\\/Jan-24-cost-14.jpg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2023\\\/12\\\/20\\\/Jan-24-cost-14.jpg\",\"width\":1100,\"height\":612},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/2024\\\/01\\\/23\\\/bim-360-cost-management-january-2024\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM 360 Cost Management &#8211; January 2024\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#website\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/\",\"name\":\"BIM 360 Release Notes\",\"description\":\"Updates and enhancements\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/#\\\/schema\\\/person\\\/f7ae60b470148ba8999768d7aa89b9ca\",\"name\":\"Ian Turner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"contentUrl\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/wp-content\\\/uploads\\\/sites\\\/127\\\/2018\\\/11\\\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg\",\"caption\":\"Ian Turner\"},\"url\":\"https:\\\/\\\/blogs.autodesk.com\\\/bim360-release-notes\\\/author\\\/ianturner\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BIM 360 Cost Management - January 2024 - BIM 360 Release Notes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/","og_locale":"en_US","og_type":"article","og_title":"BIM 360 Cost Management - January 2024 - BIM 360 Release Notes","og_description":"Note: Images are of Autodesk Build. However, the functionality is the same within BIM 360 Cost Management. BUDGET TOOL\u00a0 Add Optional Scope Field in Budget Import\u2013 A new Scope column has been added to the Excel Budget import template to remove the need to set the Scope field in Cost Management manually if preferred.","og_url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/","og_site_name":"BIM 360 Release Notes","article_published_time":"2024-01-23T15:06:31+00:00","article_modified_time":"2024-02-01T18:30:41+00:00","og_image":[{"width":1100,"height":612,"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-14.jpg","type":"image\/jpeg"}],"author":"Ian Turner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ian Turner","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#article","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/"},"author":{"name":"Ian Turner","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca"},"headline":"BIM 360 Cost Management &#8211; January 2024","datePublished":"2024-01-23T15:06:31+00:00","dateModified":"2024-02-01T18:30:41+00:00","mainEntityOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/"},"wordCount":1178,"commentCount":0,"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-14.jpg","keywords":["BIM 360 Cost Management"],"articleSection":["Cost Management","Project Controls"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/","name":"BIM 360 Cost Management - January 2024 - BIM 360 Release Notes","isPartOf":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#primaryimage"},"image":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#primaryimage"},"thumbnailUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-14.jpg","datePublished":"2024-01-23T15:06:31+00:00","dateModified":"2024-02-01T18:30:41+00:00","author":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca"},"breadcrumb":{"@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#primaryimage","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-14.jpg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2023\/12\/20\/Jan-24-cost-14.jpg","width":1100,"height":612},{"@type":"BreadcrumbList","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/2024\/01\/23\/bim-360-cost-management-january-2024\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/"},{"@type":"ListItem","position":2,"name":"BIM 360 Cost Management &#8211; January 2024"}]},{"@type":"WebSite","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#website","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/","name":"BIM 360 Release Notes","description":"Updates and enhancements","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/#\/schema\/person\/f7ae60b470148ba8999768d7aa89b9ca","name":"Ian Turner","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","contentUrl":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-content\/uploads\/sites\/127\/2018\/11\/1FDAD67D-BC16-477F-A05C-F5463A8B2ACD-150x150.jpeg","caption":"Ian Turner"},"url":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/author\/ianturner\/"}]}},"_links":{"self":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/3258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/users\/22366"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/comments?post=3258"}],"version-history":[{"count":0,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/posts\/3258\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media\/3272"}],"wp:attachment":[{"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/media?parent=3258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/categories?post=3258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/bim360-release-notes\/wp-json\/wp\/v2\/tags?post=3258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}