{"id":359,"date":"2016-04-26T15:50:00","date_gmt":"2016-04-26T21:50:00","guid":{"rendered":"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/?p=359"},"modified":"2016-04-26T15:50:00","modified_gmt":"2016-04-26T21:50:00","slug":"logistica-de-sitio-en-contexto","status":"publish","type":"post","link":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/logistica-de-sitio-en-contexto\/","title":{"rendered":"Log\u00edstica de sitio en contexto"},"content":{"rendered":"<p>\u00bfQu\u00e9 pasar\u00eda si se pudiera anticipar el desarrollo de una obra y su log\u00edstica antes de siquiera mover una piedra?<\/p>\n<p><a href=\"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra4.jpg\" rel=\"attachment wp-att-372\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-372\" src=\"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra4-300x171.jpg\" alt=\"Obra4\" width=\"300\" height=\"171\" srcset=\"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra4-300x171.jpg 300w, https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra4-768x437.jpg 768w, https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra4-1024x582.jpg 1024w, https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra4.jpg 1602w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Con Infraworks 360, es posible dise\u00f1ar el sitio de trabajo y su log\u00edstica en contexto. Es decir, podemos analizar<span style=\"line-height: 1.5\">\u00a0las v\u00edas cr\u00edticas de entrada de materiales, manejo de gr\u00faas, tr\u00e1fico en horas pico, construcciones colindates al sitio, etc. <\/span><\/p>\n<p><span style=\"line-height: 1.5\">En los proyectos donde la obra se encuentra alejada o con restricci\u00f3n de recursos como agua potable y electricidad, se vuelve a\u00fan m\u00e1s importante\u00a0la log\u00edstica de v\u00edas de suministro al sitio de trabajo. La planeaci\u00f3n previa a la etapa de construcci\u00f3n es\u00a0cr\u00edtica en el desarrollo, tiempos y costos del proyecto. Es por esto que\u00a0una visualizaci\u00f3n en 3D con informaci\u00f3n de calles y edificios es muy \u00fatil para analizar propuestas de trabajo y estudios de sitio.\u00a0<\/span><\/p>\n<p><span style=\"line-height: 1.5\">A partir del modelo se\u00a0pueden generar investigaciones a detalle para facilitar <\/span>el dise\u00f1o de proyecto de acuerdo a c\u00f3digos y regulaciones locales\/nacionales as\u00ed como\u00a0la obtenci\u00f3n de permisos y autorizaciones de trabajo.<\/p>\n<p>Mediante sencillos pasos de dise\u00f1o en 3D podemos dibujar el sitio de trabajo planeado y sus elementos en cada fase del proyecto para posteriormente comunicarlo a los due\u00f1os, subcontratistas y dem\u00e1s equipo de trabajo.<\/p>\n<p><a href=\"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/wp-content\/uploads\/sites\/51\/2016\/04\/obra5.jpg\" rel=\"attachment wp-att-375\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-375\" src=\"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/wp-content\/uploads\/sites\/51\/2016\/04\/obra5-300x162.jpg\" alt=\"obra5\" width=\"300\" height=\"162\" srcset=\"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/obra5-300x162.jpg 300w, https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/obra5-768x414.jpg 768w, https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/obra5-1024x553.jpg 1024w, https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-content\/uploads\/sites\/51\/2016\/04\/obra5.jpg 1599w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>\u00a0 \u00a0 \u00a0 \u00a0<a href=\"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra2.jpg\" rel=\"attachment wp-att-366\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-366\" src=\"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra2-300x157.jpg\" alt=\"Obra2\" width=\"307\" height=\"164\" \/><\/a><\/p>\n<p><a href=\"http:\/\/autode.sk\/22hRQpk\" target=\"_blank\">VIDEO DEMOSTRACION EN ESPA\u00d1OL<\/a><\/p>\n<p>En resumen, gracias a la colaboraci\u00f3n y visualizaci\u00f3n en contexto dentro de Infraworks 360 podemos prevenir movimientos estrat\u00e9gicos en nuestra obra, ahorr\u00e1ndonos riesgos, tiempo y dinero en la etapa de construcci\u00f3n.<\/p>\n<p>M\u00e1s informaci\u00f3n sobre: <a href=\"http:\/\/www.autodesk.com\/products\/infraworks-360\/overview?_ga=1.69994640.1829220286.1429122770\" target=\"_blank\">Infraworks 360<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00bfQu\u00e9 pasar\u00eda si se pudiera anticipar el desarrollo de una obra y su log\u00edstica antes de siquiera mover una piedra?<\/p>\n<p><a href=\"https:\/\/blogs.autodesk.com\/futuro-de-la-infraestructura\/wp-content\/uploads\/sites\/51\/2016\/04\/Obra4.jpg\" rel=\"attachment wp-att-372\"><\/a><\/p>\n<p>Con Infraworks 360, es posible dise\u00f1ar el sitio de trabajo y su log\u00edstica en contexto. Es decir, podemos analizar\u00a0las v\u00edas cr\u00edticas de entrada de materiales,<\/p>\n","protected":false},"author":186,"featured_media":366,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[24,12,15,21,30,9,18,42,33],"tags":[],"class_list":["post-359","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-arquitectura","category-carreteras","category-drenaje","category-edificacion","category-estructura","category-infraestructura","category-puentes","category-simulaciones","category-tendencias-de-industria"],"acf":[],"_links":{"self":[{"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/posts\/359","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/users\/186"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/comments?post=359"}],"version-history":[{"count":0,"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/posts\/359\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/media\/366"}],"wp:attachment":[{"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/media?parent=359"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/categories?post=359"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/futuro-de-la-construccion\/wp-json\/wp\/v2\/tags?post=359"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}