{"id":23203,"date":"2022-01-27T12:53:34","date_gmt":"2022-01-27T10:53:34","guid":{"rendered":"https:\/\/blogs.autodesk.com\/villagebim?p=23203"},"modified":"2022-01-27T12:53:41","modified_gmt":"2022-01-27T10:53:41","slug":"workflow-liez-les-logiciels-infraworks-formit-for-windows-et-revit","status":"publish","type":"post","link":"https:\/\/blogs.autodesk.com\/villagebim\/2022\/01\/workflow-liez-les-logiciels-infraworks-formit-for-windows-et-revit.html","title":{"rendered":"[Workflow] Liez les logiciels InfraWorks, Formit For Windows et Revit"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"627\" height=\"511\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-27.jpg\" alt=\"\" class=\"wp-image-23260\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-27.jpg 627w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-27-300x244.jpg 300w\" sizes=\"auto, (max-width: 627px) 100vw, 627px\" \/><\/figure>\n\n\n\n<p>D\u2019ann\u00e9e en ann\u00e9e, Autodesk renforce les connexions entre les logiciels de la collection AEC mais aussi propose des formats d\u2019\u00e9change plus g\u00e9n\u00e9raliste comme IFC, OBJ, FBX\u2026<\/p>\n\n\n\n<p>Je profite de ce billet pour vous pr\u00e9senter un workflow que j\u2019ai imagin\u00e9 qui combine trois logiciels de l\u2019AEC collection&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Autodesk InfraWorks<\/strong>&nbsp;: logiciel de mod\u00e9lisation dans le domaine de l\u2019infrastructure<\/li><li><strong>Autodesk FormIt For Windows<\/strong>&nbsp;: logiciel de mod\u00e9lisation conceptuelle<\/li><li><strong>Autodesk Revit<\/strong>&nbsp;: logiciel de mod\u00e9lisation dans le domaine du b\u00e2timent<\/li><\/ul>\n\n\n\n<p>Le logiciel Autodesk InfraWorks va me servir <strong>pour cr\u00e9er un contexte<\/strong> urbain, puis le logiciel Autodesk FormIt For Windows fera la liaison vers Autodesk Revit.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"118\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-1.jpg\" alt=\"\" class=\"wp-image-23206\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-1.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-1-300x36.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-1-768x93.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<p><strong><u>1- Le worflow&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p><strong><u>1.1 &#8211; Autodesk InfraWorks&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Je vais me servir du module \u00ab&nbsp;<strong><em>Mod\u00e8le Builder<\/em><\/strong>&nbsp;\u00bb afin de cr\u00e9er un contexte.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Dans l\u2019interface d\u2019InfraWorks, cliquez sur le bouton \u00ab&nbsp;<strong><em>Model Builder\u2026<\/em><\/strong>&nbsp;\u00bb et indiquez&nbsp;:<ul><li>Le lieu<\/li><\/ul><ul><li>La zone couverte<\/li><\/ul><ul><li>Le nom du mod\u00e8le, une description (facultatif)<\/li><\/ul><ul><li>Un syst\u00e8me de coordonn\u00e9e<\/li><\/ul><\/li><li>Cliquez sur le bouton \u00ab&nbsp;<strong><em>Cr\u00e9er un mod\u00e8le<\/em><\/strong>&nbsp;\u00bb<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"497\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-2.jpg\" alt=\"\" class=\"wp-image-23208\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-2.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-2-300x152.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-2-768x390.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>Quelques minutes apr\u00e8s, vous allez recevoir un courriel vous indiquant que le mod\u00e8le est disponible<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"980\" height=\"859\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-3.jpg\" alt=\"\" class=\"wp-image-23210\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-3.jpg 980w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-3-300x263.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-3-768x673.jpg 768w\" sizes=\"auto, (max-width: 980px) 100vw, 980px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>De retour dans&nbsp; l\u2019interface d\u2019InfraWorks, cliquez sur le fichier et choisissez o\u00f9 vous voulez stocker vos donn\u00e9es (Autodesk Docs ou sur votre ordinateur)<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"979\" height=\"597\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-4.jpg\" alt=\"\" class=\"wp-image-23212\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-4.jpg 979w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-4-300x183.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-4-768x468.jpg 768w\" sizes=\"auto, (max-width: 979px) 100vw, 979px\" \/><\/figure>\n\n\n\n<p><strong><u>R\u00e9sultat apr\u00e8s ouverture du fichier&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"977\" height=\"527\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-5.jpg\" alt=\"\" class=\"wp-image-23214\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-5.jpg 977w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-5-300x162.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-5-768x414.jpg 768w\" sizes=\"auto, (max-width: 977px) 100vw, 977px\" \/><\/figure>\n\n\n\n<p>A partir de ce moment, je vais exporter une partie du mod\u00e8le InfraWorks au format FBX.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Cliquez dans l\u2019onglet \u00ab&nbsp;<strong><em>Pr\u00e9senter\/partager<\/em><\/strong>&nbsp;\u00bb puis sur le bouton \u00ab&nbsp;<strong><em>Exporter le mod\u00e8le 3D\u2026<\/em><\/strong>&nbsp;\u00bb<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"553\" height=\"323\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-6.jpg\" alt=\"\" class=\"wp-image-23216\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-6.jpg 553w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-6-300x175.jpg 300w\" sizes=\"auto, (max-width: 553px) 100vw, 553px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>D\u00e9finissez la zone d\u2019export ainsi que l\u2019endroit de l\u2019enregistrement puis validez<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"820\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-7.jpg\" alt=\"\" class=\"wp-image-23218\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-7.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-7-300x252.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-7-768x644.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<p><strong><u>1.2- Autodesk FormIt For Windows&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Dans le logiciel Autodesk FormIt For Windows, cliquez sur le bouton \u00ab&nbsp;<strong><em>Importer Localement\u2026<\/em><\/strong>&nbsp;\u00bb disponible dans le menu d\u00e9roulant \u00ab&nbsp;<strong><em>Fichier<\/em><\/strong>&nbsp;\u00bb, choisir format FBX, pointez sur le fichier puis cliquez sur le bouton \u00ab&nbsp;<strong><em>Ouvrir<\/em><\/strong>&nbsp;\u00bb<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"906\" height=\"809\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-8.jpg\" alt=\"\" class=\"wp-image-23220\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-8.jpg 906w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-8-300x268.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-8-768x686.jpg 768w\" sizes=\"auto, (max-width: 906px) 100vw, 906px\" \/><\/figure>\n\n\n\n<p><strong><u>R\u00e9sultat de l\u2019import du fichier au format FBX&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"678\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-9.jpg\" alt=\"\" class=\"wp-image-23222\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-9.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-9-300x208.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-9-768x532.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>Cliquez sur le bouton \u00ab&nbsp;<strong><em>Enregistrer l\u2019esquisse Localement\u2026<\/em><\/strong>&nbsp;\u00bb disponible dans le menu d\u00e9roulant \u00ab&nbsp;<strong><em>Fichier<\/em><\/strong>&nbsp;\u00bb<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"862\" height=\"804\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-10.jpg\" alt=\"\" class=\"wp-image-23224\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-10.jpg 862w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-10-300x280.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-10-768x716.jpg 768w\" sizes=\"auto, (max-width: 862px) 100vw, 862px\" \/><\/figure>\n\n\n\n<p><strong><u>1.3- Autodesk Revit&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Dans le logiciel Revit, ouvrez le gabarit de votre choix<\/li><li>Dans l\u2019onglet \u00ab&nbsp;<strong><em>Ins\u00e9rer<\/em><\/strong>&nbsp;\u00bb cliquez sur le bouton \u00ab&nbsp;<strong><em>Importer CAO<\/em><\/strong>&nbsp;\u00bb<\/li><li>S\u00e9lectionnez le type de format \u00e0 importer (AXM \u2013 FormIt), pointez sur le fichier puis cliquez sur le bouton \u00ab&nbsp;<strong><em>Valider<\/em><\/strong>&nbsp;\u00bb<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"979\" height=\"1008\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-11.jpg\" alt=\"\" class=\"wp-image-23226\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-11.jpg 979w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-11-291x300.jpg 291w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-11-768x791.jpg 768w\" sizes=\"auto, (max-width: 979px) 100vw, 979px\" \/><\/figure>\n\n\n\n<p><strong><u>R\u00e9sultat de l\u2019import AXM&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"979\" height=\"653\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-12.jpg\" alt=\"\" class=\"wp-image-23228\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-12.jpg 979w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-12-300x200.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-12-768x512.jpg 768w\" sizes=\"auto, (max-width: 979px) 100vw, 979px\" \/><\/figure>\n\n\n\n<p>En cons\u00e9quence, dans l\u2019environnement du logiciel Autodesk Revit, je vais pouvoir cr\u00e9er le projet dans le contexte actuel.<\/p>\n\n\n\n<p><strong><u>2- Premi\u00e8re extension du workflow&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Depuis la version d\u2019Autodesk Revit 2022, il est possible d\u2019ouvrir une connexion bidirectionnelle directe avec Autodesk FormIt For Windows afin d\u2019it\u00e9rer entre la conception et la mod\u00e9lisation de d\u00e9tails.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"979\" height=\"216\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-13.jpg\" alt=\"\" class=\"wp-image-23230\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-13.jpg 979w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-13-300x66.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-13-768x169.jpg 768w\" sizes=\"auto, (max-width: 979px) 100vw, 979px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>Dans l\u2019onglet \u00ab&nbsp;<strong><em>Volume et site<\/em><\/strong>&nbsp;\u00bb, cliquez sur le bouton \u00ab&nbsp;<strong><em>Esquisse 3D<\/em><\/strong>&nbsp;\u00bb<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"416\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-14.jpg\" alt=\"\" class=\"wp-image-23232\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-14.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-14-300x128.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-14-768x327.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>Vous \u00eates invit\u00e9 \u00e0 choisir entre deux options (j\u2019ai pris \u00ab&nbsp;avec tous les objets Revit visibles&nbsp;\u00bb)<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"853\" height=\"524\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-15.jpg\" alt=\"\" class=\"wp-image-23234\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-15.jpg 853w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-15-300x184.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-15-768x472.jpg 768w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-15-305x188.jpg 305w\" sizes=\"auto, (max-width: 853px) 100vw, 853px\" \/><\/figure>\n\n\n\n<p><strong><u>R\u00e9sultat&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"681\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-16.jpg\" alt=\"\" class=\"wp-image-23236\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-16.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-16-300x209.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-16-768x535.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<p>Apr\u00e8s quelques minutes de mod\u00e9lisation dans FormIt For Windows, j\u2019ai r\u00e9alis\u00e9 l\u2019esquisse d\u2019un b\u00e2timent avec les mat\u00e9riaux respectifs.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"696\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-17.jpg\" alt=\"\" class=\"wp-image-23238\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-17.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-17-300x213.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-17-768x547.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<p>Enfin pour renvoyer le concept du b\u00e2timent vers Revit&nbsp;:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>S\u00e9lectionnez les objets \u00e0 importer<\/li><li>Cliquez sur l\u2019ic\u00f4ne \u00ab&nbsp;<strong><em>Retour vers Revit<\/em><\/strong>&nbsp;\u00bb puis le bouton \u00ab&nbsp;<strong><em>Ok<\/em><\/strong>&nbsp;\u00bb<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"979\" height=\"553\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-18.jpg\" alt=\"\" class=\"wp-image-23240\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-18.jpg 979w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-18-300x169.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-18-768x434.jpg 768w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-18-355x200.jpg 355w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-18-477x270.jpg 477w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-18-738x418.jpg 738w\" sizes=\"auto, (max-width: 979px) 100vw, 979px\" \/><\/figure>\n\n\n\n<p><strong><u>R\u00e9sultat dans l\u2019interface de Revit&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"650\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-19.jpg\" alt=\"\" class=\"wp-image-23242\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-19.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-19-300x199.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-19-768x510.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<p><strong><u>3- Deuxi\u00e8me extension du workflow&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Pour boucler la boucle, il est possible de mettre \u00e0 jour dans InfraWorks le projet \u00e0 un stade plus abouti issu de Revit et cela au format natif RVT.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"980\" height=\"198\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-20.jpg\" alt=\"\" class=\"wp-image-23244\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-20.jpg 980w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-20-300x61.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-20-768x155.jpg 768w\" sizes=\"auto, (max-width: 980px) 100vw, 980px\" \/><\/figure>\n\n\n\n<p>Dans Revit, j\u2019ai effectu\u00e9 quelques modifications en quelques minutes (ajout de terrasses, gardes corps) puis j\u2019enregistre le fichier.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"980\" height=\"900\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-21.jpg\" alt=\"\" class=\"wp-image-23246\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-21.jpg 980w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-21-300x276.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-21-768x705.jpg 768w\" sizes=\"auto, (max-width: 980px) 100vw, 980px\" \/><\/figure>\n\n\n\n<p>Depuis le logiciel InfraWorks, je viens placer le projet finalis\u00e9 \u00e0 partir du menu \u00ab&nbsp;<strong><em>Sources de donn\u00e9es<\/em><\/strong>&nbsp;\u00bb<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"433\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-22.jpg\" alt=\"\" class=\"wp-image-23248\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-22.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-22-300x133.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-22-768x340.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"769\" height=\"1024\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-23-769x1024.jpg\" alt=\"\" class=\"wp-image-23250\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-23-769x1024.jpg 769w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-23-225x300.jpg 225w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-23-768x1022.jpg 768w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-23.jpg 807w\" sizes=\"auto, (max-width: 769px) 100vw, 769px\" \/><\/figure>\n\n\n\n<p><strong><u>R\u00e9sultat une fois le projet finalis\u00e9 plac\u00e9 dans le projet d\u2019infrastructure&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"533\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-24.jpg\" alt=\"\" class=\"wp-image-23252\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-24.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-24-300x163.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-24-768x419.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"978\" height=\"537\" src=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-25.jpg\" alt=\"\" class=\"wp-image-23254\" srcset=\"https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-25.jpg 978w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-25-300x165.jpg 300w, https:\/\/blogs.autodesk.com\/villagebim\/wp-content\/uploads\/sites\/154\/2022\/01\/24\/image-25-768x422.jpg 768w\" sizes=\"auto, (max-width: 978px) 100vw, 978px\" \/><\/figure>\n\n\n\n<p><strong><u>4 -R\u00e9sum\u00e9 du workflow complet&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p><strong>[Workflow] Liez les logiciels InfraWorks, Formit For Windows et Revit<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/blogs.autodesk.com\/2e6d31df-f910-419a-87b1-27685b79fa92\" alt=\"\" \/><\/figure>\n\n\n\n<p><strong>Nota  important :<\/strong> Autodesk InfraWorks permet de g\u00e9olocaliser les mod\u00e8les suivant diff\u00e9rents r\u00e9f\u00e9rentiels n\u00e9anmoins dans le workflow \u00e9voqu\u00e9 ci-dessus le g\u00e9or\u00e9f\u00e9rencement n&rsquo;est pas pris en charge par le logiciel Autodesk FormIt For Windows (et donc perdu pour le restant de la suite du workflow). <\/p>\n","protected":false},"excerpt":{"rendered":"<p>D\u2019ann\u00e9e en ann\u00e9e, Autodesk renforce les connexions entre les logiciels de la collection AEC mais aussi propose des formats d\u2019\u00e9change plus g\u00e9n\u00e9raliste comme IFC, OBJ, FBX\u2026 Je profite de ce billet pour vous pr\u00e9senter un workflow que j\u2019ai imagin\u00e9 qui combine trois logiciels de l\u2019AEC collection&nbsp;: Autodesk InfraWorks&nbsp;: logiciel de mod\u00e9lisation dans le domaine de [&hellip;]<\/p>\n","protected":false},"author":4760,"featured_media":23258,"menu_order":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[3326,3381,15,3357,3568,3566,3304,3309,3394,3325,6],"tags":[],"class_list":["post-23203","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-autodesk-infrastructure-modeler","category-autodesk-infraworks","category-autodesk-revit","category-batiment","category-formit","category-infraworks-2","category-infraworks","category-interoperabilite-revit","category-revit","category-tips-tricks","category-trucs-et-astuces","dhig-theme--light"],"acf":[],"_links":{"self":[{"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/posts\/23203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/users\/4760"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/comments?post=23203"}],"version-history":[{"count":0,"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/posts\/23203\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/media\/23258"}],"wp:attachment":[{"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/media?parent=23203"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/categories?post=23203"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.autodesk.com\/villagebim\/wp-json\/wp\/v2\/tags?post=23203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}