twitter youtube facebook linkedin email
Connect with:

BIM 360 Release Notes

Cash Flow Forecasting

With the latest Cost Management release, teams can now create forecast distributions for each budget item and access a project-level cash flow analysis to visualize the difference between planned actual and forecast quickly. Click here to view a step-by-step guide.

Connecting Cost & Time

  • Connect schedule tasks to budget line items to quickly determine duration and enable calculations for annual price increases.

 

Built-In Forecast Distribution Curves

  • Perform forecast distributions for each budget line item. Choose from four built-in forecast distribution curves, including front-loaded, rear-loaded, typical, and linear.
  • When performing distributions to items connected to schedule tasks, dates automatically pull in, but can be altered if necessary.
  • Customize the distribution further by adding or removing date ranges.
  • Easily make edits within the forecast final cost field as you make projections.
  • The system will auto-flag if the distribution total doesn’t match the forecast-final cost.

 

Project Level Cash Flow Analysis

  • Access a project-level cash flow analysis in the new Forecast tool. A built-in dynamic time-versus-money chart, allows you to visualize the project-level cash flow distribution throughout the project lifecycle.
  • Within this view, the information is summarized by revised budget, work completed, actual costs, and forecast-final cost, which can be viewed by period or cumulatively.
  • Ability to quickly drill down into details if needed. 

MktoForms2.loadForm(“//app-ab10.marketo.com”, “572-JSV-775”, 2332);

#mktoForm_2332 > div:nth-child(3) > div.mktoFieldDescriptor.mktoFormCol > div.mktoFieldWrap.mktoRequiredField > div.mktoGutter.mktoHasWidth{
width:0px;
}
#mktoForm_2332 > div.mktoButtonRow > span > button{
color: #fff;
background-color: #1858A8 !important;
background-image: none !important;
border: 0px !important;
}
#mktoForm_2332 > div:nth-child(3) > div.mktoFieldDescriptor.mktoFormCol > div.mktoFieldWrap.mktoRequiredField > div.mktoLogicalField.mktoCheckboxList.mktoHasWidth.mktoRequired, #mktoForm_2332, #mktoForm_2332 > div:nth-child(2) > div.mktoFieldDescriptor.mktoFormCol > div.mktoFieldWrap.mktoRequiredField
{width: 100%!important;}
#mktoForm_2332 > div:nth-child(2) > div.mktoFieldDescriptor.mktoFormCol > div.mktoOffset,#mktoForm_2332 > div:nth-child(3) > div.mktoFieldDescriptor.mktoFormCol > div.mktoFieldWrap.mktoRequiredField > div.mktoGutter.mktoHasWidth, #mktoForm_2332 > div:nth-child(2) > div.mktoFieldDescriptor.mktoFormCol > div.mktoFieldWrap.mktoRequiredField > div.mktoGutter.mktoHasWidth{
display: none;
}
#Email{
width: 75%!important;
}
#LblEmail{
width: 84px!important;
}
#mktoForm_2332 > div:nth-child(2) > div.mktoFieldDescriptor.mktoFormCol{
margin-top: 10px;
width: 100%;
}

Subscribe to email digests.

Featured Links

Ian Turner

0 Comments

'